Phase 1

The Right side 4 cubes are BC (Blind Cell) machines

The Left side 4 cubes are PT (Pass-Through) machines

The center 4 are platform conveyors for loading the other 8

With a load/unload station on each end.

Click on A machine to see a more detailed page for each machine.

This simplified graphic demonstrates the arrangement of system elements
This phase is estimated at 70+ % complete

Secured By miniOrange