Here the system has reached general manufacturing capability, Equipment, structural components and full systems can be produced.
Note: The primitive illustration does not capture the wide ranging capacity of the system at this point, this is only a faint suggestion that the phase 1-3 accumulation of capability and capacity makes nearly any design possible,
The buildings shown are more a product of the limits of the author’s time and drafting skill, at this point a very conventional framed lumber structure could be built and the tools, right down to the sawmill used to cut lumber for it are possible, however inadvisable that might be.
Geodesic structures are actually the easiest to make at this point due to the structural elements for the buildings being short and very standard in dimension.
There being less than 20 part numbers for the structural parts of a dome,